Frequently asked questions
Everything customers ask before the first call, in one place: prices, technology, permits and delivery. Each answer points to the detailed guide — and if your question is missing, message us on WhatsApp.
Prices
Why are the prices “indicative”?
Because the final sum depends on three things we only learn at the consultation: the plot (hence the foundation), the transport distance and any changes to the design. After the consultation you get a fixed price for the whole job.
What does “kit from €500/m²” mean for a 100 m² house?
About €50,000 for the complete structure assembled and closed — design, panels, assembly, roof, windows and exterior doors. The turnkey version of the same house starts at about €100,000.
How much does the rest cost if I choose the kit?
As an order of magnitude, as much as the kit again: installations, additional insulation, finishes, interior joinery, bathrooms and kitchen make the difference between ~€500 and ~€1000/m².
How long until I can move in?
Kit production takes 2–4 weeks from order confirmation, the structure goes up in days, and a turnkey house is ready in up to 3 months.
Technology and durability
How strong is a SIP house?
A SIP panel is a monolithic structure: the OSB acts as the load-bearing layer and the polystyrene as a rigid core. The panel withstands loads of up to 1.5 tonnes per m² and holds up to wind, snow load, and seismic movement.
Will mold or condensation form in the walls?
Mold and condensation come from assembly mistakes and poor ventilation, not the material itself. We seal every panel joint and offer ventilation solutions, including heat-recovery units — follow a few simple care rules and moisture won't be an issue.
Does SIP burn like ordinary foam?
We use self-extinguishing polystyrene, and the panel is protected on both sides by OSB boards and the finish — an open flame doesn't reach the insulation directly. We also build in fire-safety measures: wiring in protected conduits and fire-resistant materials indoors.
How long does a SIP house last?
Assembled correctly and protected from moisture, a SIP house lasts 50 years or more — panels don't settle, crack, or lose their insulating performance over decades. We use an adhesive that stays flexible for the panel's full lifespan and prevents delamination.
How warm is it in winter and cool in summer?
A 150 mm SIP wall has thermal conductivity comparable to a brick wall over 2 metres thick. That means heating savings of up to 60% — and in summer, many clients don't need air conditioning at all: airing the house out at night is enough.
Why is SIP faster and often cheaper than timber frame or block?
Panels are manufactured ahead of time at the factory, so the site work is just assembly — no "wet" processes like concrete or plaster, so building can continue year-round. The shell goes up in 2–4 weeks, and the whole cycle — from deposit and ready permits to the keys — takes about 3 months. With a lighter foundation, fewer work stages, and heating savings, a SIP house ends up costing no more, and often less, than a block or timber-frame house of the same quality.
Can you hear everything through a SIP wall?
The panel itself damps impact noise well. For airborne sound between rooms we use stud partitions with mineral wool and insulate the floors — that keeps the house comfortable for everyday living.
Is the SIP panel toxic?
All materials are certified: the polystyrene is inert and doesn't release harmful substances inside a closed panel, and the OSB's formaldehyde level stays within European norms (E0–E1).
Permits and paperwork
Do I need a building permit for a small SIP house?
Yes. Any new structure fixed to the ground — house, outbuilding, cabin on a foundation — needs a permit regardless of size. The “magic” 15 m² permit-free threshold is a myth: Romania's Law 50/1991 has no area threshold for new buildings. A SIP house is permitted exactly like a brick one.
What are the steps to a building permit in Romania?
Four steps: the urban planning certificate from the town hall, the technical design by a licensed architect and engineers, the approvals the certificate requires, and the complete file submission. Realistically it takes 3–6 months from plot to permit — longer than the build itself.
Which documents does the file need?
The standard application, a valid urban planning certificate, proof of land ownership (land registry extract), the technical documentation signed by licensed specialists, the approvals listed in the certificate, a geotechnical study and proof of fee payment. Town halls may ask for extra local documents.
Does Homebly help with the design documentation?
Yes. Every catalogue design comes with full technical documentation calculated to Eurocode, which we adapt to your plot and urban planning certificate. While the file is with the authorities, the factory can produce the panels in parallel.
Delivery, assembly, Hungary, warranty
Do you deliver across Romania? And to Hungary?
Yes, across Romania and within the EU. The Baia Mare factory is about 70 km from the Hungarian border; for sites abroad we offer either a full assembly team or a supervising engineer plus a local crew — agreed in the offer.
How much is transport of the kit?
Transport is quoted in the offer based on the distance between Baia Mare and your plot; it is not part of the per-m² price. Panels leave the factory labelled and stacked in assembly order.
Who assembles the house and how long does it take?
Our own crews, not occasional subcontractors. Kit production takes 2–4 weeks from order confirmation; the structure goes up on the foundation in a few days, and a turnkey house is ready in up to 3 months.
What warranty do you give?
We give a warranty on the load-bearing structure and the thermal insulation; the exact term is set in the contract at the consultation. The house's 50+ year lifespan depends on correct assembly and designed ventilation — which is why we do both ourselves.
Let's talk about your house
Leave a request and we'll call you back with answers — or message us on WhatsApp right now.