Skip to content
Homebly

Comparisons: SIP, brick, timber, A-frame or barnhouse

All our comparisons in one place, with the same figures as the price pages: choose the technology and the format first, then the design.

The comparison guides

The technology matrix

A summary of the two guides; every row is detailed in its article.

CriterionSIP panelsBrickClassic timber frame
Where the wall is builtIn the factory, cut to the design; only assembly on siteOn site, layer by layer, with drying timesOn site, by hand, from five or six layers
The structure of the house1–2 weeksMonths; wet processes stop in winterWeeks of skilled work
Price of the shell on its foundationFrom €400/m², without windows, fixed by the factory before work startsMore labour and a costlier foundation at equal qualitySame price range as SIP, but crew-dependent
Insulation and thermal bridgesContinuous insulation with no studs in the wall; joints and assembly decide how it performsGood thermal mass, but needs an extra insulation layerEvery stud is a thermal bridge; compensated with one more layer
FoundationLight: strip, slab or piers, by plotHeavier and costlier — the structure is heavyLight, timber-skeleton structure
Dependence on the crewQuality is decided in the factory; in Romania the producer's team assemblesDepends on good tradesmen at every stageThe result is proportional to the hands that make it
When it is the right choiceNew house with a rational design, fixed price, short timelineThermal mass a priority, heavy finishes required locally, traditionNon-standard architecture, extensions and loft conversions, your own crew

A-frame or barnhouse

Same factory, same price formula — the shape and who the house is for differ.

A-frameBarnhouse
Designs in the catalogue6, from 45.8 to 147 m²13, from 39.6 to 151.4 m²
ShapeTwo roof slopes almost to the ground; the walls are also the roofRectangular volume, gable roof, vertical walls
Interior spaceHigh ceiling at the centre; on small designs, a sleeping loftFurniture against the wall and normal rooms upstairs
For whomRental cabins, glamping, weekend houses, sloped plotsA family house lived in all year, with an office and storage
PriceShell on foundation from €400/m², turnkey from €900/m²Same formula

A-frame →Barnhouse →SIP house prices →

Frequently asked questions

Which technology is the cheapest?

At equal quality SIP is usually no more expensive: a lighter foundation, fewer stages on site. But "always cheaper" does not exist — the architecture, the plot and the finishing level move the picture, so compare complete estimates for identical houses. Shell on foundation from €400/m², turnkey from €900/m².

Which builds fastest?

SIP: the structure in 1–2 weeks and the roof in about a week, and a turnkey house in up to 6 months from deposit and permits. The gain shows on site: masonry has more sequential operations and processes that need curing time, so its structure usually takes longer; a classic timber frame needs weeks of skilled work on site.

A-frame or barnhouse for a family?

Barnhouse: vertical walls give normal rooms and furniture against the wall. The A-frame wins on silhouette and photos, hence on rental cabins and glamping.

Undecided between the options?

Tell us the plot and how you will use the house — we recommend the technology and the design, with a fixed price after the consultation.

Optional — helps us prepare a more precise offer.

We’ll reply on WhatsApp at this number. By submitting this form, you agree to our privacy policy.